Industry overview

Polypropylene Applications by Industry

Six application areas, twelve modified grades and a base resin range. Tell us the part and the process, and we will match the grade — or develop one.

MOQ 10 MT · Lead time 4 days after payment · 20 days for custom formulations

Polypropylene pellets for industrial applications

Illustrative image

Not on the list

Custom formulations

If your part is not covered above, we develop a formulation against your drawing and performance target.

  • Filler selection

    Talc, calcium carbonate, glass fibre, barium sulphate and other mineral fillers, chosen against stiffness and cost targets.

  • Flame retardancy

    Unfilled, mineral-filled and glass-fibre reinforced FR formulations. Flammability ratings confirmed per grade.

  • Typical development time

    Up to 20 days for a custom formulation, against 4 days for a standard grade after payment.

Not sure which grade fits?

Send the part drawing, the process and the performance target — we will come back with a grade and its data sheet.

Scroll to Top